Lean Dimensions International
LEAN DIMENSIONS
INTERNATIONAL

Case studies

Operational excellence case studies

Ten real improvements led by Johan Majlov, each told as Involve, Engage, Empower, with before-and-after numbers. Client names are kept confidential.

Machine performance

Old liquid line output tripled in five months, building the buffer to install a new line

35k → 110kunits a week
1,000 → 0–1leaking bottles a week
Machine performance

A plant optimization system lifted output by more than 15% in three tire plants

+15%output, three plants
Maintenance and reliability

A focused improvement event stopped breakdowns on a bottle line and raised speed by up to 17%

2 → 0breakdowns a shift
+17%line speed
Quality

Customer complaints cut by 90% and weekly output up 75% in three months, building leadership support along the way

−90%customer complaints
80k → 140kunits a week
Quality

A military engine factory halved the labor hours per engine and cut quality anomalies from 35 per engine to zero

1,600 → 800labor hours per engine
35 → 0anomalies per engine
Flow and lead time

A timed milk run from six test benches to painting cut lead time from three days to one

3 → 1days, test to delivery
Flow and lead time

Two stick pack lines tripled weekly output and cut leaks by 96% in three months, with the same people and shifts

30k → 95kunits a week
400 → 14leak ppm
Daily management

A tiered daily meeting system, built bottom-up by front-line leaders, lifted output 8–12% and engagement from 60% to 90%

+8–12%output
60% → 90%engagement
Leadership and culture

A Lean transformation made one plant the company's model site: EBITDA four times higher

×4EBITDA
−90%lead time
Leadership and culture, Safety

An employee-led safety program took OSHA-recordable incidents from five a year to zero

5 → 0recordable incidents a year

Start with a conversation

Tell us about your operation. Johan replies within two business days.

Talk to Johan