The challenge

Demand was rising, the two lines made 30,000 to 32,000 units a week with a lot of overtime, and 400 sticks per million leaked. The habit was to slow down whenever something went wrong.

What we did

Involve
Operators backed every initiative; leaders owned CILT, training and shift handover meetings.
Engage
Instead of slowing down, each problem was removed at the root. The vendor reprogrammed the pick-and-place robot, the carton design was fixed with the carton supplier, the filler was upgraded to stop leaks, and set-up time was cut.
Empower
Training and CILT so the team kept the lines at full speed.

The results

MeasureBeforeAfter
Weekly output, both lines30,000–32,00095,000
Leaking sticks400 ppm14 ppm
OvertimeA lotSporadic
Headcount and shiftsBaselineUnchanged

Slowing down felt safe, but it hid every problem. Once the team trusted that problems could be removed, speed became the normal state.