Glossary
Operational excellence glossary
The terms Johan Majlov uses in the LDI OpEx Academy and in his consulting, each in plain words.
Operational Excellence 2.0 (OpEx 2.0) · The 45° · IEE: Involve, Engage, Empower · Ownership transformation · Loss · Short stop · The 7 flow wastes · Gemba · Genchi genbutsu · Gemba walk · Value stream map · Value-added ratio · Kaizen · Kaikaku · Kakushin · PDCA · The 3 phases of change · 5 Why · The "therefore" check · The 5 M's · The countermeasure ladder · PTS: the Performance Tracking System · Tier meeting · SQDCPT · 5S · One-point lesson (OPL) · CILT · A-OpEx, P-OpEx, S-OpEx, M-OpEx
Operational Excellence 2.0 (OpEx 2.0)
Johan Majlov's approach to operational excellence: the classic tools and logic of lean, plus the people side, involving, engaging and empowering people so results last. It rests on one idea: eradicating losses.
The 45°
The line where logic and emotion meet. Change succeeds when the logical side (systems, data, methods) and the emotional side (people, trust, ownership) move together. In the LDI logo, blue is logic, red is emotion, and yellow is the 45°.
IEE: Involve, Engage, Empower
Johan Majlov's method for making improvement last: involve people first, engage them, then empower them. Not related to IEEE. Read more.
Ownership transformation
The bottom of the OpEx 2.0 triangle: moving an improvement from a small project team into the line organization, so the people who do the work every day own it.
Loss
Any time, speed or product a line could have made, but didn't: short stops, breakdowns, speed loss, set-up, defects, manning and waiting for material. If a KPI is not where you want it, losses are pulling it down.
Short stop
A stop under 10 minutes that the operator restarts alone. Short stops are counted, not timed, and multiplied by an agreed average length. A stop over 10 minutes, or one that needs help, is a breakdown.
The 7 flow wastes
Overproduction, inventory, transport, motion, defects and rework, over-processing and waiting: the wastes that make lead time longer. Overproduction causes most of the others.
Gemba
The actual place where value is created: the line, the warehouse, the lab bench, the operating room.
Genchi genbutsu
Go and see for yourself. It rests on three reals: the real place (gemba), the real thing (genbutsu) and the real facts (genjitsu).
Gemba walk
A regular, planned walk to the place where the work happens, to observe, engage with people and find what to improve. Respectful and open questions, never inspecting people.
Value stream map
A map of the value you give the customer and every step it takes to create it, including where material and information wait. The first map focuses on the system; the second on the assets.
Value-added ratio
Value-added time divided by total lead time. In Johan's mapping it is often around five hundredths of a percent.
Kaizen
Continuous improvement in small steps. Johan uses four sizes: quick (24 to 48 hours), standard (3 to 5 days), major (about 90 days) and advanced (longer than 3 months).
Kaikaku
Radical change: an intense event, often 40 to 60 hours at the line with a team from several disciplines, observing first, then repairing and rebuilding on the spot.
Kakushin
Innovation: finding a completely different way of doing it when a line already runs at its best and it is still not enough. Creativity first, criticism later.
PDCA
Plan, Do, Check, Act. Plan is the biggest part. Check means checking whether the plan works, not whether tasks are done. Act means writing the standard and training on it, or re-planning.
The 3 phases of change
Basic conditions, improve, innovate. Putting basic conditions in place typically removes about half of a problem; improving starts from a common standard; innovating takes it toward zero.
5 Why
A root cause method: ask why until you reach a cause in the system that, once fixed, stops the problem from coming back. It's 5 why, not 5 who. Also called why-why analysis.
The "therefore" check
Reading a finished 5 Why chain backwards with "therefore" between each step, to test that every link holds.
The 5 M's
Man, machine, method, material and Mother Nature (the environment): the areas to check at each step of a process when looking for a root cause.
The countermeasure ladder
Countermeasures from weakest to strongest: tell and train, auditing, visual control, mistake proofing, automate, eliminate. The higher the step, the less it depends on people remembering.
PTS: the Performance Tracking System
Johan's daily management system: tier meetings where every team reviews its own numbers every day, solves what it can and escalates what it can't. Tier 1 at the start and end of each shift, then tiers 2, 3 and 4.
Tier meeting
A short, standing meeting at a board. Tier 1 is the team on the floor, 10 to 15 minutes; tier 2 the area, about 30 minutes; tier 3 the site, 30 to 45 minutes; tier 4 the company, usually weekly.
SQDCPT
The six themes on a PTS board: safety, quality, delivery, cost, people and training.
5S
Sort, set in order, shine, standardize and sustain. Johan teaches it as an agreement the team makes about how it wants to work together, with shadow boards at the point of use.
One-point lesson (OPL)
A quick way to write a standard, or one point of it, about 80% pictures. Three types: basic knowledge, problem and improvement. Real training means the person can show you how it's done.
CILT
Clean, inspect, lubricate and tighten: the routine operators use to care for their own equipment. Cleaning is inspection.
A-OpEx, P-OpEx, S-OpEx, M-OpEx
The four certification levels of the LDI OpEx Academy: Associate, Practitioner, Specialist and Master of Operational Excellence. See the levels.