Case study · Maintenance and reliability
A focused improvement event stopped breakdowns on a bottle line and raised speed by up to 17%
Vitamin and supplement maker · USA · bottling. In short: 2 → 0 breakdowns a shift; +17% line speed. Client name kept confidential.
2 → 0breakdowns a shift
+17%line speed
The challenge
About two breakdowns a shift, 35 minutes each on average, and 13 short stops a shift. Set-up with cleaning took 60 to 65 minutes.
What we did
- Engage
- The neck bander was repaired and the belts leveled, a cleaning standard was set for the cotton inserter, and the capper and belts were adjusted.
- Empower
- CILT routines, preventive maintenance, visual standards, set-up organization and daily communication.
The results
| Measure | Before | After |
|---|---|---|
| Line speed, desiccant products | 88 bottles a minute | 103 (+17%) |
| Line speed, cotton products | 72 bottles a minute | 80 (+11%) |
| Breakdowns | About 2 a shift | None after the actions |
All case studies · The IEE method
Start with a conversation
Tell us about your operation. Johan replies within two business days.